Emergency repairs for the pier for this year have been completed. The shuttering over the two big holes at the back of the pier was removed by the contractors on Monday morning. Now we wait to see what the winter throws at us this time! Scottish Water have also indicated that the temporary structure currently housing their electrical equipment on the pier is scheduled to be replaced by the end of November. Meanwhile fundraising for the pier continues. Please support the craft fair being held to boost pier funds at the Kirk Centre in Ellon on Saturday November 16 from 1 to 4 pm.
